Fermi Site Office CX Determinations

Determination Date Name of Action: Description Categorical Exclusion Number
3/27/2026 Transportation of LLW - Tritiated Water Disposal B1.28, B1.30
3/19/2026 Adoption of Generic CX B5.2 Modifications to pumps and piping B5.2
3/19/2026 Adoption of Generic CX B2.5 Facility safety and environmental improvements B2.5
2/12/2026 NEPA Categorical Exclusion: FSO CX Determination Building Equipment and Instrumentation B2.2
2/12/2026 NEPA Categorical Exclusion: FSO CX Determination Installation or Relocation of Machinery and Equipment B1.31
12/9/2025 CX Determination for Installation of Turnkey Cooling Water Tower Treatment System (also known as Mixed Oxidant System - MIOX) at Central Utility Building B1.3, B1.31
11/13/2025 CX Determination Infrastructure Modifications for MAGIS-100 B2.2, B3.6
11/13/2025 CX Determination FUSRAP Phase II Project at IARC B3.6, B3.10
11/12/2025 CX Determination Generic CX B1.3 Routine Maintenance B1.3
11/12/2025 CX Determination Generic CX B3.6 Small-Scale Research B3.6