Fermi Site Office CX Determinations

Determination Date Name of Action: Description Categorical Exclusion Number
11/12/2026 Accelerator ICW Return System GPP B1.15, B5.5, B5.2
10/28/2026 Temporary deployment of Underwater Muon Modules in Lake Vermilion and Ely Island, Minnesota B3.6, B1.31
3/26/2026 Transportation of LLW - Tritiated Water Disposal B1.28, B1.30
3/18/2026 Adoption of Generic CX B5.2 Modifications to pumps and piping B5.2
3/18/2026 Adoption of Generic CX B2.5 Facility safety and environmental improvements B2.5
2/11/2026 NEPA Categorical Exclusion: FSO CX Determination Building Equipment and Instrumentation B2.2
2/11/2026 NEPA Categorical Exclusion: FSO CX Determination Installation or Relocation of Machinery and Equipment B1.31
12/8/2025 CX Determination for Installation of Turnkey Cooling Water Tower Treatment System (also known as Mixed Oxidant System - MIOX) at Central Utility Building B1.3, B1.31
11/12/2025 CX Determination Infrastructure Modifications for MAGIS-100 B2.2, B3.6
11/12/2025 CX Determination FUSRAP Phase II Project at IARC B3.6, B3.10