Consolidated Service Center

Determination Date Name of Action: Description Categorical Exclusion Number
9/8/2020 Solar River Phase-2 Initial prototype build and testing B3.8
9/2/2020 Resilient Solar Racking System to Provide Consistent Electricity to Areas Impacted by Natural Disasters B5.16
8/6/2020 Sterile Insect Technique X-ray Irradiator B3.6
8/6/2020 SBIR Phase IIB Grant: "Vacuum Glass for R-10 Windows" (develop mfg process to support commercialization) B5.1, B3.6
6/7/2020 AEM Water Electrolyzer for Hydrogen Production from Off-Shore Wind B3.6
6/29/2020 A Novel Low Cost Thermal Energy Storage for Building Equipment Peak Load B3.6, B5.1
6/30/2020 Next-Generation Modified Metal Organic Frameworks for CO2 Capture B3.6
6/17/2020 CREATES: CO2 REduction for grAphiTE Synthesis B3.6
6/4/2020 No-Heat Soldering using Supercooled Liquid Metal Microcapsules B3.6
6/3/2020 Reclaim E-Waste B3.6