Argonne Site Office CX Determinations
Determination Date | Name of Action: Description | Categorical Exclusion Number |
---|---|---|
12/16/2009 | ASO-CX-260 Investigation of Photoactive Devices and Catalysts (CSE062) | B3.6 |
12/16/2009 | ASO-CX-259 Operation of the 20 MeV Electron Linac Accelerator, including upgrade to 50 MeV (CSE060) | B3.10 |
2/9/2010 | ASO-CX-262 Generic Categorical Exclusion: Miscellaneous Installations and Maintenance Activities | B1.3-B1.5; B1.9; B1.11; B1.15-B1.17; B1.22; B1.27; B1.31; B2.1-B2.3; B2.5 |
1/25/2010 | ASO-CX-263 200 Area Chilled Water Plant | B1.15 |
12/16/2009 | ASO-CX-258 Operation of 3 MeV electron Van de Graaff Accelerator (CSE059) | B3.10 |