Argonne Site Office CX Determinations

Determination Date Name of Action: Description Categorical Exclusion Number
5/22/2012 ASO-CX-293 Wind Energy Installations-Wind Turbine Project B5.18
1/9/2013 ASO-CX-294 Joint Center for Energy Storage Research (JCESR) Energy Innovation Center B3.6
7/29/2011 ASO-CX-291 Energy Science Building Temporary Parking and Lay Down Area B2.5
5/16/2011 ASO-CX-286 The Advanced Photon Source (APS) Upgrade Project B3.6
5/17/2011 ASO-CX-287 Energy Science Building B3.6
7/22/2011 ASO-CX-289 Building 366 Expansion, Operation, and Maintenance B3.6
5/18/2011 ASO-CX-288 Building 203 Upgrade and Operation of the Detector Laboratory B3.6
7/29/2011 ASO-CX-290 Building 108 Boilers 1-5 NOx Emission Reduction Project B2.5
5/9/2011 ASO-CX-285 Construction and Operation of the Materials Design Laboratory B3.6
3/3/2011 ASO-CX-280 Refurbishing of the Quantum Design SQUID Magnetometer B3.6